SexualHeaven.Com

Downstairs Guest Bathroom Remodel

The downstairs bathroom remodel has picked back up. Previously, the walls were painted, tile installed where possible, and the vanity partially refinished. The next steps are to finish the tile, repaint, replace the vanity, and upgrade the plumbing to SharkBite connections.

Flooring and a bathroom vanity.
The tile up to the old vanity.
A bathroom vanity.
The new vanity still in the box.
A painted ceiling and walls.
New ceiling paint, an upgraded grille, and prepping for wall paint.
A reassembled bathroom.
Put back together and ready for the vanity removal.
The old vanity coming out.
The old vanity coming out.
What I'm left working with from the builder.
What I'm left working with from the builder.
A nice view of how well the new tile blends.
A nice view of how well the new tile blends.
The old tile stripped out.
The old tile stripped out.
The wall painted and ready for tile.
The wall painted and ready for tile.
A tiled floor.
The tile all set in place.
An installed vanity.
The vanity set to the wall.
A top down look of the vanity.
I hadn't considered the drawers when buying this. I got lucky with the valve clearances.
The finished bathroom.
The finished bathroom.
An vanity with handles attached.
The handles and pulls installed on the vanity.
A fully installed vanity.
The finished vanity.
The finished bathroom.
The finished bathroom.